Execution & Implementation4 months

The Challenge

CloudFirst Pty Ltd needed to migrate their core business applications to Azure while maintaining connectivity to on-premises systems. The migration had to be completed with minimal disruption to 24/7 operations.

Our Solution

Working alongside CloudFirst's operations team, we co-developed a phased migration plan with detailed cutover procedures and rollback strategies. Together, we established ExpressRoute connections, redesigned network segmentation for the hybrid model, and performed comprehensive testing at each phase.

Results

The migration was completed two weeks ahead of schedule with zero unplanned downtime. The hybrid architecture provided improved flexibility and scalability while reducing infrastructure costs.

Unplanned Downtime

Before

4hrs/month

After

0hrs

Deployment Speed

Before

2 weeks

After

2 hours

Infrastructure Cost

Before

$200K/yr

After

$140K/yr

Scalability

Before

Limited

After

On-demand

Technologies Used

AzureExpressRouteTerraformAnsible

Let's Solve This Together

Your challenge becomes our challenge. Tell us what you're working through and we'll figure out the right approach together.